I ran into this issue and i think its an known one by now and it all has to do with how frontend date-parsing and localization works in Morpheus / VME Manager 9.0.x .The Morpheus 9.0.x UI frontend (React/JavaScript) renders timestamps using the client browser’s local date formatting and then parses them internally with new Date(...).When accessing the UI from a browser configured with a DD/MM/YYYY locale (such as French fr-FR, UK en-GB, Swiss de-CH, or other European locales), the parser expects MM/DD/YYYY but whenever the day of the month is 13 or greater (e.g., October 22nd): Whenever the day of the month is 13 or greater (e.g., October 22nd) and because month 22 is invalid, JavaScript throws a RangeError: Invalid time value.The workarround is simple and is the same one pointed out in this thread. Option 1: Set Morpheus / VME User Locale to en-US (Recommended)In the VME Manager UI, click your user profile icon in the top-right corner and select User Settings.Find the Default Locale setting.Change it from browser default to English (United States) (en_US).Save the settings, log out, clear your browser cache, and log back in. Option 2: Adjust Browser Language PreferenceIn your browser (Chrome, Edge, or Firefox), go to Settings → Languages.Add English (United States) (en-US) if not already present.Move English (United States) to the top of the preferred languages list (so en-US takes precedence over European/French locales).Restart the browser and reload the VME Manager UI. Saw somewhere that this issue is fixed in Morpheus 9.1.0 and later
| # | Наименование новости | Тональность | Информативность | Дата публикации |
|---|---|---|---|---|
| 1 | Re: VME V9.1 Manager Install (HPE_Morpheus_Manager_SW_image_v9.1.0-1_S5Q83-11089.iso) | 0 | 8.23 | 25-10-2026 |
| 2 | Re: Infoblox installed on Morpheus KVM is not starting | 0 | 8.06 | 23-09-2026 |
| 3 | Customers may experience delays in UI updates | 0 | 8.22 | 15-09-2026 |
| 4 | how to solve the error | -1 | 14.4 | 17-06-2026 |
| 5 | Re: HPE VM Essentials Morpheus 9 UPS shutdown and start up | 0 | 10.38 | 23-09-2026 |
| 6 | CRITICAL: Prolonged Cluster Partition / Split-Brain on 3-Node HPE VME 8 Cluster | 0 | 13.74 | 24-09-2026 |
| 7 | Opera 134 developer | -3 | 6 | 26-06-2026 |
| 8 | OAuth authorize redirects to homepage instead of consent screen | 0 | 11.1 | 19-09-2026 |
| 9 | European Public Diplomacy Days 2026 | 0 | 30.75 | 09-07-2026 |
| 10 | EIPIP Meeting #129, Aug 12, 2026 | 0 | 18.66 | 15-07-2026 |